0,00 €
Zum Warenkorb
  • KVM Verlag
Filter
Leon G. Horrichs

Implants for the Anterior Maxillary Region

50 Minuten

Rubrik(en): Implantologie
Sprache(n): Englisch, Deutsch
Publikationsjahr: 2003
Video-Quelle: ZMK-Live

Contents

  • Implant planning and positioning
  • Preparation
  • Drilling and thread-cutting
  • Implant insertion
  • Wound closure

Synopsis
The implant position is determined using a drill guide/x-ray template (regions 34-32-42-44). A Peeso drill is inserted in the drill guide and used to mark the position in the mucoperiosteum. An incision is made, and the mucoperiosteum is displaced.
The implant insertion sites are prepared by using a 2 mm twist drill, 2/3 mm pilot drill, 3 mm and 3/5 mm twist drills. This is followed by counter-drilling and thread-cutting. The implants were loaded at 40-50 N. The wound is then closed using GORE-TEX® suture material.

Empfohlene Videos

  
frei

Eclipse, a material for bite-raising appliances, baseplates and temporary dentures

Peter Schwieren

Länge: 15 Minuten
Produktionsjahr: 2006
Sprache: Englisch, Deutsch
Reihen: Dental Video Magazin
Kategorie: Zahntechnik
verfügbar seit: 30. Aug. 2007

frei

Verschiedene Brückenarten

Gerd H. Basting / Alexander Ammann

Länge: 1 Minuten
Produktionsjahr: 2007
Sprache: Deutsch, Englisch
Quelle: PED
Kategorie: Festsitzender Zahnersatz
verfügbar seit: 1. Juli 2011

frei

'Nie wieder verlorener Biss', Grundlagen und Durchführung des Memobite-Verfahrens

Gerd Christiansen

Länge: 28 Minuten
Produktionsjahr: 2018
Sprache: Deutsch, Englisch
Reihen: Dental Video Journal
Kategorie: Prothetik
verfügbar seit: 17. Okt. 2018