0,00 €
Zum Warenkorb
  • Quintessence Publishing United Kingdom
Filter
Leon G. Horrichs

Implants for the Anterior Maxillary Region

50 Minuten

Rubrik(en): Implantologie
Sprache(n): Englisch, Deutsch
Publikationsjahr: 2003
Video-Quelle: ZMK-Live

Contents

  • Implant planning and positioning
  • Preparation
  • Drilling and thread-cutting
  • Implant insertion
  • Wound closure

Synopsis
The implant position is determined using a drill guide/x-ray template (regions 34-32-42-44). A Peeso drill is inserted in the drill guide and used to mark the position in the mucoperiosteum. An incision is made, and the mucoperiosteum is displaced.
The implant insertion sites are prepared by using a 2 mm twist drill, 2/3 mm pilot drill, 3 mm and 3/5 mm twist drills. This is followed by counter-drilling and thread-cutting. The implants were loaded at 40-50 N. The wound is then closed using GORE-TEX® suture material.

Empfohlene Videos

  
frei

Ballon Lift Control System, Arbeitsanleitung und Fall aus der Praxis

Karl-Heinz Heuckmann

Länge: 12 Minuten
Produktionsjahr: 2006
Sprache: Deutsch, Englisch
Reihen: Dental Video Magazin
Kategorie: Implantologie
verfügbar seit: 1. Juli 2007

frei

Nobel Active Implantat 3.0 in Regio 42

Robert Nölken

Länge: 32 Minuten
Produktionsjahr: 2015
Sprache: Deutsch, Englisch
Reihen: Dental Video Journal
Kategorie: Implantologie
verfügbar seit: 7. Apr. 2015

frei

Unterer zentraler Schneidezahn mit Perforation

Michael Arnold

Länge: 45 Minuten
Produktionsjahr: 2019
Sprache: Deutsch, Englisch
Reihen: Dental Video Journal
Kategorie: Endodontie
verfügbar seit: 18. Dez. 2019