0,00 €
Zum Warenkorb
  • Quintessence Publishing United Kingdom
Filter
Leon G. Horrichs

Implants for the Anterior Maxillary Region

50 Minutes

Category: Implantology
Language(s): English, German
Publication year: 2003
Video source: ZMK-Live

Contents

  • Implant planning and positioning
  • Preparation
  • Drilling and thread-cutting
  • Implant insertion
  • Wound closure

Synopsis
The implant position is determined using a drill guide/x-ray template (regions 34-32-42-44). A Peeso drill is inserted in the drill guide and used to mark the position in the mucoperiosteum. An incision is made, and the mucoperiosteum is displaced.
The implant insertion sites are prepared by using a 2 mm twist drill, 2/3 mm pilot drill, 3 mm and 3/5 mm twist drills. This is followed by counter-drilling and thread-cutting. The implants were loaded at 40-50 N. The wound is then closed using GORE-TEX® suture material.

Recommended videos

  

Esthetic and Restorative Dentistry - Esthetic Post Systems

Douglas A. Terry

Length: 14 minutes
Production year: 2014
Language: English, German
Series: Dental Video Journal
Category: Esthetic Dentistry
available since: 1. Jul 2014

free

Vollkeramische Rekonstruktion bei Patienten mit Parafunktionen

Diether Reusch

Length: 24 minutes
Production year: 2009
Language: German
Source: 60 Jahre Quintessenz
Category: Prosthodontics
available since: 11. Jan 2010

free

Au Backe - mein Zahn

Gerd H. Basting / Alexander Ammann

Length: 1 minutes
Production year: 2007
Language: German, English
Source: PED
Category: Root canal treatment
available since: 1. Jul 2011